Tuesday, 17 May 2016

So it's been coming together pretty fast and smoothly which has been great. Bec had a squiz yesterday and noticed the render has been painted now which is the colour, tranquil retreat and the front door and cedar cladding has been stained now which is good. Some other stuff that has happened is the drive way has been cut out and the concrete should be poured soon. Air con was also getting installed. Lots of internal stuff has been done such as tiling, bathroom vanities, shower screens, toilets, taps etc. We are also meant to have the bamboo flooring put in later this week or early next week so that should just about finish off the majority of work. So we don't look to be that far away from being finished :)

Sunday, 8 May 2016

We have updated some more pics below, main changes that we could tell is the stone for the bench has been put on, there is still the black kickboard to go on so almost finished. The bathrooms have been fully tiled now, doors have been painted and where there is going to be carpet, the skirting has been put on. Enjoy the pics.
 
 
The bench with the stone top, where the 3 panels are, will be black to keep the theme of the black and white kitchen going.


Main bathroom fully tiled with the shower niche.

Main bathroom vanity, will have a crystal black stone top put on.

These are the ensuite doors, it was originally meant to just be open but Bec pushed for the doors and I think it looks really nice.

Ensuite full tiled, again missing the crystal black stone bench top.


The background is the main alfresco to the left and the niche is where the entertainment unit and TV will be put up.

Thursday, 14 April 2016

The living room, the niche is where the entertainment unit and TV will go.

These are the bedroom doors to the master, we saw the 1 and a half door entry on the display and it was too awesome not to have.

The kitchen, the wine rack is on the left of the fridge space, overhead cupboards in black, lower cupboards in white. To the right is a glass cupboard which is for some nice glassware. The island bench isn't finished and will be 1m wide when complete.




The is the inside of the island bench which will also have black cupboard.



Main bathroom that has white cupboards and will have a crystal black stone bench on top.

I think this is the laundry..

Separate toilet minus the toilet

Laundry I believe.


Wide shot of the combined living and dining.


Pantry door.

Inside of the glassware cabinet.

Hey Guys,

Bec was around at the house today as we were having people come in to do some window measuring so she went and had a sneaky look around the house, we haven't really seen much of the inside so it was all kinda new! Anyway I will post some pics so you get an idea. Its amazing how much they have done inside in such a short time. Cant say enough good things about Adenbrook Sydney.

Sunday, 10 April 2016

This is the front door but no handle has been put on just yet. Bec LOVES the door and reckons she could sit out the front and admire it for a few hours easy.
 
This pic is from a far and shows the cladding on the right corner, it shows on the front and on the side as we had to have the façade stretch across the side as we are on a corner block.

We had a quiz at the house on Saturday and noticed that the cornices and architraves look to be finished in the house and we can also see the internal doors all waiting to be installed. We also noticed the front door is now on (minus the handle) and the outside timber cladding has been put on (Not sure if this is the final colour or if it gets a stain).

The builder has indicated it's a pretty busy two weeks ahead with water proofing, tiling, carpenters and painters all due to come out so hopefully a fair bit inside gets completed.

Sorry for the lack of photos of the inside but we haven't been in to see it so are restricted to mainly outside photos at the moment.

Sunday, 3 April 2016

I think it was around the 31st March that we had the guys come out to do the gyprock which I believe only took a day or so to get done and we could see they are starting to put up the cornices which is cool! The builder reckons the gyprocking guys should be finished this week but then we aren't sure what the next part is just yet.

We don't have any photos of the gyprock yet as we haven't been through but once we get some updated ones we will post them.