Tuesday 17 May 2016

 
This is the drive way that was cut and now ready for the concrete pour.

Render and stain completed.

Side shot of the cladding


So it's been coming together pretty fast and smoothly which has been great. Bec had a squiz yesterday and noticed the render has been painted now which is the colour, tranquil retreat and the front door and cedar cladding has been stained now which is good. Some other stuff that has happened is the drive way has been cut out and the concrete should be poured soon. Air con was also getting installed. Lots of internal stuff has been done such as tiling, bathroom vanities, shower screens, toilets, taps etc. We are also meant to have the bamboo flooring put in later this week or early next week so that should just about finish off the majority of work. So we don't look to be that far away from being finished :)

Sunday 8 May 2016

We have updated some more pics below, main changes that we could tell is the stone for the bench has been put on, there is still the black kickboard to go on so almost finished. The bathrooms have been fully tiled now, doors have been painted and where there is going to be carpet, the skirting has been put on. Enjoy the pics.
 
 
The bench with the stone top, where the 3 panels are, will be black to keep the theme of the black and white kitchen going.


Main bathroom fully tiled with the shower niche.

Main bathroom vanity, will have a crystal black stone top put on.

These are the ensuite doors, it was originally meant to just be open but Bec pushed for the doors and I think it looks really nice.

Ensuite full tiled, again missing the crystal black stone bench top.


The background is the main alfresco to the left and the niche is where the entertainment unit and TV will be put up.