Thursday 14 April 2016

The living room, the niche is where the entertainment unit and TV will go.

These are the bedroom doors to the master, we saw the 1 and a half door entry on the display and it was too awesome not to have.

The kitchen, the wine rack is on the left of the fridge space, overhead cupboards in black, lower cupboards in white. To the right is a glass cupboard which is for some nice glassware. The island bench isn't finished and will be 1m wide when complete.




The is the inside of the island bench which will also have black cupboard.



Main bathroom that has white cupboards and will have a crystal black stone bench on top.

I think this is the laundry..

Separate toilet minus the toilet

Laundry I believe.


Wide shot of the combined living and dining.


Pantry door.

Inside of the glassware cabinet.

Hey Guys,

Bec was around at the house today as we were having people come in to do some window measuring so she went and had a sneaky look around the house, we haven't really seen much of the inside so it was all kinda new! Anyway I will post some pics so you get an idea. Its amazing how much they have done inside in such a short time. Cant say enough good things about Adenbrook Sydney.

Sunday 10 April 2016

This is the front door but no handle has been put on just yet. Bec LOVES the door and reckons she could sit out the front and admire it for a few hours easy.
 
This pic is from a far and shows the cladding on the right corner, it shows on the front and on the side as we had to have the façade stretch across the side as we are on a corner block.

We had a quiz at the house on Saturday and noticed that the cornices and architraves look to be finished in the house and we can also see the internal doors all waiting to be installed. We also noticed the front door is now on (minus the handle) and the outside timber cladding has been put on (Not sure if this is the final colour or if it gets a stain).

The builder has indicated it's a pretty busy two weeks ahead with water proofing, tiling, carpenters and painters all due to come out so hopefully a fair bit inside gets completed.

Sorry for the lack of photos of the inside but we haven't been in to see it so are restricted to mainly outside photos at the moment.

Sunday 3 April 2016

I think it was around the 31st March that we had the guys come out to do the gyprock which I believe only took a day or so to get done and we could see they are starting to put up the cornices which is cool! The builder reckons the gyprocking guys should be finished this week but then we aren't sure what the next part is just yet.

We don't have any photos of the gyprock yet as we haven't been through but once we get some updated ones we will post them.